portfolio_page-template-default,single,single-portfolio_page,postid-475,bridge-core-3.2.0,jps-theme-bridge,qode-page-transition-enabled,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-smooth-scroll-enabled,qode-theme-ver-30.8.3,qode-theme-bridge,qode_header_in_grid,qode-portfolio-single-template-8,wpb-js-composer js-comp-ver-8.0,vc_responsive
 

PR-10 Utuado to Adjuntas

Control stations established by GPS and topography for 11 kilometers long. AS-Built Topography of an area of approximately 61 acres. Subsequently conducted a field study of strip of land with an average length of 5.3 kilometers long and 300 meters wide – Sections II, III and IV from the Guánica Lake to Adjuntas.

Category
Highways